![]() Please includes screenshots in your submission. Note: Industry professionals may not have Revit on the device they are using to provide feedback. ![]() Appendices: client survey, client meeting notes, images of proposed features.Calculations – Water Supply, Storm Water Runoff, Wastewater, and Heat Loss Step 1: Gene that codes for GFP is extracted from a jellyfish and placed into a plasmid using restriction enzymes.Supporting Documents – Bubble Diagrams, Rough Floor Plan Sketches, Final Floor Plan Sketch, Electrical Plan Sketch, Plumbing Plan Sketch, Site Opportunities Map.End of Feedback Cycle PLTW Lab Notebook: 1. Construction Drawings in Revit – Site Plan, Rendering, Floor Plan (fully dimensioned), Four Elevations, Interior Elevations Of Bathroom And Kitchen (optional), Typical Wall Section including foundation (with labeled components), Window Schedule, Door Schedule, Room Schedule, Electrical Plan (optional), Plumbing Plan (optional) PLTW 3.2.3 Flow Chart: Create a flowchart or diagram that outlines what happens from initial injury to successful clotting.Project Description – General overview, list of criteria and constraints, and a discussion of both universal design features and green/sustainability features.Students submit a single PDF that includes the following: ![]() Items italicized should be considered minimum requirements for submission. This list is a suggested list of documents. Different teachers may require different documents. There are many documents that students may submit with their design. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |